Home
Remedy EPR
2026 reporting · 4 min read

Prepare for UK pEPR reporting in 2026

Build component-level records, apply the correct RAM guidance and test your RPD file before the reporting deadline.

Written by Remedy EPR · Updated August 2026

Packaging records prepared for 2026 pEPR reporting

The 2026 work that changes your dataset

Large producers report packaging data twice a year. The next large-producer deadline is 1 October 2026. Small producers register and report annually by 1 April. Check the current GOV.UK deadline page because your reporting route depends on producer size and the period covered.

RAM now affects fees

Producers use red, amber and green ratings for in-scope household packaging. Year 2 fee modulation applies a 20% uplift to red packaging against the amber rate.

Plastic needs a subtype

The current reporting file separates flexible and rigid plastic, including where a producer does not submit RAM data.

Use the right RAM version. PackUK says producers assessing packaging supplied in 2026 should use the 2026 materials and outputs document. RAM 2027 applies to packaging supplied in 2027.

Create one record for each component

Store the material and weight of the bottle, cap, label, sleeve and shipment packaging separately. Add the packaging activity, household status, nation data and plastic subtype required by your reporting case. Keep the supplier specification or measurement record behind each value.

Field Record Evidence
Component One row per separable packaging part Bill of materials or pack specification
Material and mass Accepted category, subtype and grams Supplier sheet or measured sample
Market activity Supply, import, own-brand or marketplace role Contract and transaction record
RAM result Rating plus assessment route Decision answers and supporting test

Control estimates and changes

Record who approved an estimate, the sample used and the products it covers. Keep effective dates when a supplier changes a component. A current weight must not overwrite the value used in a submitted period.

Reconcile reported mass against units sold or imported. Investigate changes by material and activity, then keep the explanation with the approved report.

Test the RPD file

  • Download the current file specification and accepted codes.
  • Generate a draft with the correct period code.
  • Check totals against product and transaction data.
  • Resolve rejected rows and review warnings.
  • Archive the submitted file, confirmation and approval record.

A practical 30-day plan

Week Owner Output
1 Compliance Scope, producer tier and reporting calendar
2 Packaging and procurement Missing component data and supplier requests
3 Data team Transaction join, RAM records and draft file
4 Finance and approver Reconciliation, sign-off and controlled submission

Investigate material and fee movements

Compare the draft with the previous period by material, activity and household status. Separate sales growth from data corrections. A new supplier weight, corrected SKU mapping or changed classification can move tonnage without any change in units sold.

Variance Check first Evidence
Mass rises faster than sales Duplicate joins or heavier pack SKU-level bridge
Household tonnage moves Classification or channel mapping Decision record
Red RAM share increases New products or reassessments RAM change log
Material disappears Missing supplier or unmatched SKU Completeness report

Prepare finance and compliance handoffs

Compliance should approve classifications and RAM results. Finance should review the tonnage bridge and fee assumptions. The authorised submitter should receive a locked file, reconciliation and unresolved-issue statement.

After submission, update forecasts with approved mass rather than copying figures from an uncontrolled working spreadsheet.

Turn guidance into a controlled process

Prepare accurate EPR reports without rebuilding spreadsheets

Remedy EPR automates data imports and calculations, detects compliance errors and keeps evidence ready for review.

Check current requirements in the GOV.UK EPR collection, the RPD file specification and the deadline guidance.