Home
Remedy EPR
RPD submission · 5 min read

How to use the Defra Report Packaging Data service

Prepare the current file structure, resolve validation errors and retain a submission pack that another reviewer can reproduce.

Written by Remedy EPR · Updated August 2026

Packaging data prepared for an RPD submission

Before you open RPD

Confirm the reporting organisation, producer size and period first. Use the current GOV.UK reporting-file specification because accepted fields and codes can change. Assign a person who can make the declaration and keep their approval with the final file.

Large producer file

Includes organisation data and detailed packaging rows for the relevant half-year period.

Small producer file

Uses the small-producer structure and annual reporting route.

RPD walkthrough

This walkthrough shows the service screens and submission flow. Check the current GOV.UK specification alongside the video because Defra can update the service.

Build the reporting file

Check Action Common failure
Header Use the exact fields in the current specification Old template or renamed column
Period Select the code for the data being reported Dates do not match the code
Classification Use accepted activity, type, class, material and nation codes Labels used instead of codes
Mass Aggregate source records into the required unit Grams entered where kg is expected
RAM Use the accepted rating where required Missing evidence or wrong RAM year

Resolve errors before submission

Run structural checks for required columns, accepted codes, number formats and blank mandatory values. Then check impossible category combinations, duplicate rows and RAM gaps. A valid file can still contain the wrong tonnage, so reconcile totals against sales, purchasing and import records.

Keep a correction log. Record the rejected row, error message, source change and reviewer. This documents the control your team applied.

Submit and archive

  • Upload the controlled file through RPD.
  • Review service warnings and rejected records.
  • Correct source data before generating a replacement.
  • Complete the declaration with the authorised approver.
  • Save the file, confirmation, reconciliation and correction log.

Error triage table

Error type Likely cause Fix at source
Unknown code Outdated mapping or free text Update the controlled code table
Missing value Incomplete product record Assign it to the data owner
Unexpected total Duplicate join, wrong unit or period Reconcile by SKU and month
RAM gap Missing component detail Collect evidence and complete the assessment

Remedy EPR automates data imports and report preparation, detects missing fields and inconsistent classifications, and keeps corrections with the reporting record.

Reconcile before upload

Compare packaging quantities with the sales, import or purchasing source that drives them. Review totals by material and activity, then compare the result with the previous reporting period. Explain movements caused by new products, corrected weights or classification changes.

Reconciliation Expected result Investigate
Order coverage Every in-scope transaction matches a product version Unknown SKU or date gap
Packaging mass Units multiplied by approved component weights Duplicate join or wrong unit
Material bridge Movement agrees with products and volumes Unexpected category shift
File total Generated rows equal approved working totals Aggregation or rounding difference

Control corrections and resubmissions

Correct the packaging record or transaction mapping that caused the error. Do not edit only the upload file, because the next report will recreate the same problem. Generate a new controlled version and retain the rejected file.

Record the reason, affected rows, change owner and approval. Check the current RPD guidance before resubmitting and preserve the new service confirmation with the original submission history.

Turn guidance into a controlled process

Prepare accurate EPR reports without rebuilding spreadsheets

Remedy EPR automates data imports and calculations, detects compliance errors and keeps evidence ready for review.

Use the current GOV.UK reporting-file specification and reporting deadlines.